Effective Financial Modelling in the Power Industry
- Structure a power project model with separate inputs, timing, operations, financing and output sections.
- Model revenue under a power purchase agreement with capacity and energy charges and availability adjustments.
- Size and sculpt senior debt to a target DSCR and model reserve accounts and cash waterfalls.
- Calculate project IRR, equity IRR and levelised cost of electricity for thermal and renewable assets.
- Run sensitivities on capex, tariff, availability, degradation and interest rates and present a tornado chart.
- Review a third-party power model using integrity checks and a structured review log.
- Power Sector Economics and Contract Structures
- IPP and IWPP models and single-buyer offtakers in the GCC
- PPA tariff structures: capacity, energy and pass-through charges
- Key risks allocated in PPAs, EPC and O&M contracts
- Model Design and Timing
- Model architecture and best-practice standards
- Construction and operations timelines and flags
- Input sheets, scenarios and version control
- Technical and Operating Assumptions
- Capacity, availability and dispatch assumptions
- Heat rates, fuel costs and renewable yield and degradation
- O&M costs, major maintenance and lifecycle reserves
- Revenue and Cost Modelling
- Tariff indexation and currency components
- Liquidated damages and availability penalties
- Operating cash flow and tax or zakat considerations
- Financing Structure
- Debt sizing on DSCR and gearing constraints
- Debt sculpting, reserve accounts and cash waterfall
- Equity returns, distributions lock-up tests
- Outputs, Sensitivities and Review
- Project IRR, equity IRR and LCOE
- Sensitivity, scenario and breakeven analysis
- Model checks and audit-ready documentation
الحصول على الكتيب
للحصول على كتيب بكامل محتويات الدورة برجاء ملء النموذج التالي ببياناتك الصحيحة

Program Professional Framework
Effective Financial Modelling in the Power Industry
Program Overview
Power and water projects in the GCC are increasingly delivered as independent power projects under long-term offtake agreements, with solar, wind and storage reshaping tariff economics. «Effective Financial Modelling in the Power Industry» trains analysts to build project finance models for generation assets: capacity and energy tariff structures, availability and degradation assumptions, construction and operating cost profiles, debt sizing on DSCR, debt sculpting, reserve accounts, equity IRR and levelised cost of electricity. Participants test bids and refinancing cases with sensitivities and scenarios.
Learning Outcomes
- ✓Structure a power project model with separate inputs, timing, operations, financing and output sections.
- ✓Model revenue under a power purchase agreement with capacity and energy charges and availability adjustments.
- ✓Size and sculpt senior debt to a target DSCR and model reserve accounts and cash waterfalls.
- ✓Calculate project IRR, equity IRR and levelised cost of electricity for thermal and renewable assets.
- ✓Run sensitivities on capex, tariff, availability, degradation and interest rates and present a tornado chart.
- ✓Review a third-party power model using integrity checks and a structured review log.
Target Audience
- Financial analysts and modellers in utilities and power developers
- Project finance and structured finance bankers
- Commercial and business development managers for power and water projects
- Planning and regulatory economists in electricity authorities
Detailed Program Modules
01Power Sector Economics and Contract Structures
- IPP and IWPP models and single-buyer offtakers in the GCC
- PPA tariff structures: capacity, energy and pass-through charges
- Key risks allocated in PPAs, EPC and O&M contracts
02Model Design and Timing
- Model architecture and best-practice standards
- Construction and operations timelines and flags
- Input sheets, scenarios and version control
03Technical and Operating Assumptions
- Capacity, availability and dispatch assumptions
- Heat rates, fuel costs and renewable yield and degradation
- O&M costs, major maintenance and lifecycle reserves
04Revenue and Cost Modelling
- Tariff indexation and currency components
- Liquidated damages and availability penalties
- Operating cash flow and tax or zakat considerations
05Financing Structure
- Debt sizing on DSCR and gearing constraints
- Debt sculpting, reserve accounts and cash waterfall
- Equity returns, distributions lock-up tests
06Outputs, Sensitivities and Review
- Project IRR, equity IRR and LCOE
- Sensitivity, scenario and breakeven analysis
- Model checks and audit-ready documentation
Training Methodology
Applied Project & Assessment
Applied Project
Participants build a project finance model for a solar PV or combined-cycle plant under a long-term PPA, sculpt debt to a target DSCR, calculate equity IRR and LCOE, and present a sensitivity report recommending a bid tariff.
Assessment
Short diagnostic at the start, practical tasks linked to each learning outcome, and evaluation of the applied project against published criteria.