Advanced Completion Design and Operation
- Translate reservoir, production and intervention requirements into a completion design basis.
- Compare lower completion options and select sand control or inflow control solutions for given reservoir conditions.
- Perform tubing stress analysis for production, injection, stimulation and shut-in load cases.
- Select packers, safety valves and accessories using ISO 14310 ratings and operating envelopes.
- Choose tubing metallurgy for sour and CO2 environments based on NACE MR0175/ISO 15156.
- Develop an installation and testing procedure with contingencies for the completion string.
- Completion Design Basis
- Reservoir, production and intervention requirements
- Inflow performance and tubing size selection
- Life-of-well considerations
- Lower Completions
- Cased and perforated versus open hole completions
- Sand control: screens, gravel packs and frac packs
- Inflow control devices for horizontal wells
- Intelligent and Multizone Completions
- Interval control valves and downhole gauges
- Zonal isolation with swellable and mechanical packers
- Monitoring and control strategies
- Upper Completion Equipment
- Production packers and ISO 14310 ratings
- Subsurface safety valves and nipple profiles
- Tubing connections and accessories
- Tubing Stress Analysis and Metallurgy
- Load cases: production, injection, stimulation and shut-in
- Temperature and pressure effects on tubing movement
- Material selection for sour and CO2 service
- Installation, Testing and Handover
- Running procedures and space-out
- Pressure testing and packer setting verification
- Completion reports and well handover
الحصول على الكتيب
للحصول على كتيب بكامل محتويات الدورة برجاء ملء النموذج التالي ببياناتك الصحيحة

Program Professional Framework
Advanced Completion Design and Operation
Program Overview
Completion design locks in a well's productivity, longevity and intervention options for its whole life. This advanced course follows the design process from reservoir and production requirements to installation: inflow and outflow considerations, lower completion options including cased and perforated, open hole and sand control, intelligent completions with inflow control devices and interval control valves, tubing stress analysis, packer and safety valve selection, metallurgy for sour and CO2 service, and installation and testing operations. Gulf examples include long horizontal wells in carbonate reservoirs and sour gas completions.
Learning Outcomes
- ✓Translate reservoir, production and intervention requirements into a completion design basis.
- ✓Compare lower completion options and select sand control or inflow control solutions for given reservoir conditions.
- ✓Perform tubing stress analysis for production, injection, stimulation and shut-in load cases.
- ✓Select packers, safety valves and accessories using ISO 14310 ratings and operating envelopes.
- ✓Choose tubing metallurgy for sour and CO2 environments based on NACE MR0175/ISO 15156.
- ✓Develop an installation and testing procedure with contingencies for the completion string.
Target Audience
- Completion and well engineers
- Production and petroleum engineers
- Well integrity engineers
- Completion supervisors and service company engineers
Detailed Program Modules
01Completion Design Basis
- Reservoir, production and intervention requirements
- Inflow performance and tubing size selection
- Life-of-well considerations
02Lower Completions
- Cased and perforated versus open hole completions
- Sand control: screens, gravel packs and frac packs
- Inflow control devices for horizontal wells
03Intelligent and Multizone Completions
- Interval control valves and downhole gauges
- Zonal isolation with swellable and mechanical packers
- Monitoring and control strategies
04Upper Completion Equipment
- Production packers and ISO 14310 ratings
- Subsurface safety valves and nipple profiles
- Tubing connections and accessories
05Tubing Stress Analysis and Metallurgy
- Load cases: production, injection, stimulation and shut-in
- Temperature and pressure effects on tubing movement
- Material selection for sour and CO2 service
06Installation, Testing and Handover
- Running procedures and space-out
- Pressure testing and packer setting verification
- Completion reports and well handover
Training Methodology
Applied Project & Assessment
Applied Project
Participants design a completion for a horizontal producer in a Gulf carbonate reservoir, delivering a design basis, lower and upper completion selection, a tubing stress check for key load cases, an equipment list and an installation procedure.
Assessment
Short diagnostic at the start, practical tasks linked to each learning outcome, and evaluation of the applied project against published criteria.


