Well Testing & Production Optimization Operations
- Design a well test programme specifying objectives, duration, equipment and safety requirements.
- Interpret a pressure buildup test to estimate permeability, skin and average reservoir pressure.
- Assess test separator and multiphase meter data quality and correct common measurement errors.
- Use nodal analysis to evaluate choke, tubing and artificial lift changes for production gain.
- Prioritise optimisation opportunities across a group of wells sharing facility constraints.
- Objectives and Types of Well Tests
- Production, drawdown, buildup and interference tests
- Exploration versus development test objectives
- Test programme design and approval
- Well Test Equipment and Operations
- Surface test packages, separators and burners
- Downhole gauges and DST strings
- HSE controls and simultaneous operations
- Pressure Transient Analysis
- Flow regimes and derivative diagnostics
- Permeability, skin and boundary estimation
- Common interpretation pitfalls
- Production Measurement and Allocation
- Test separator and MPFM accuracy
- Back-allocation and reconciliation
- Data validation and quality checks
- Production Optimisation Techniques
- Nodal analysis and well models
- Choke, lift and routing optimisation
- Stimulation candidate selection
- Integrated Field Optimisation
- Facility constraints and network modelling
- Surveillance routines and exception reporting
- Optimisation KPIs and value tracking
الحصول على الكتيب
للحصول على كتيب بكامل محتويات الدورة برجاء ملء النموذج التالي ببياناتك الصحيحة

Program Professional Framework
Well Testing & Production Optimization Operations
Program Overview
Accurate well tests are the basis for reservoir management, production allocation and optimisation decisions. This programme links the two disciplines: planning and running production and pressure transient tests, test equipment and safety, interpretation of buildup and drawdown data, and then using test results with nodal analysis to optimise chokes, lift settings and well routing. Participants also examine allocation, surveillance and integrated optimisation practices used by operators managing large Gulf fields with many wells and shared facilities.
Learning Outcomes
- ✓Design a well test programme specifying objectives, duration, equipment and safety requirements.
- ✓Interpret a pressure buildup test to estimate permeability, skin and average reservoir pressure.
- ✓Assess test separator and multiphase meter data quality and correct common measurement errors.
- ✓Use nodal analysis to evaluate choke, tubing and artificial lift changes for production gain.
- ✓Prioritise optimisation opportunities across a group of wells sharing facility constraints.
Target Audience
- Production and reservoir engineers
- Well testing engineers and supervisors
- Field operations and optimisation teams
- Production allocation and surveillance specialists
Detailed Program Modules
01Objectives and Types of Well Tests
- Production, drawdown, buildup and interference tests
- Exploration versus development test objectives
- Test programme design and approval
02Well Test Equipment and Operations
- Surface test packages, separators and burners
- Downhole gauges and DST strings
- HSE controls and simultaneous operations
03Pressure Transient Analysis
- Flow regimes and derivative diagnostics
- Permeability, skin and boundary estimation
- Common interpretation pitfalls
04Production Measurement and Allocation
- Test separator and MPFM accuracy
- Back-allocation and reconciliation
- Data validation and quality checks
05Production Optimisation Techniques
- Nodal analysis and well models
- Choke, lift and routing optimisation
- Stimulation candidate selection
06Integrated Field Optimisation
- Facility constraints and network modelling
- Surveillance routines and exception reporting
- Optimisation KPIs and value tracking
Training Methodology
Applied Project & Assessment
Applied Project
Participants interpret a supplied buildup test, calibrate a nodal model with the results, and produce an optimisation plan for a cluster of wells showing recommended choke and lift changes, expected gain and the facility constraints considered.
Assessment
Short diagnostic at the start, practical tasks linked to each learning outcome, and evaluation of the applied project against published criteria.


