Wireline Operations & Techniques (Slickline & E-Wireline)

Wireline is the most frequent form of well intervention, used for gauge runs, plug setting, valve change-outs, logging and perforating. This programme covers slickline, braided line and electric line operations: surface pressure control equipment, rig-up and pressure testing, toolstring design, jarring, running and pulling flow control devices, e-line logging and perforating, fishing and contingency planning. Safety and well control during live-well interventions receive particular attention, reflecting the operating practices of onshore and offshore operators in the region.

الحصول على الكتيب

للحصول على كتيب بكامل محتويات الدورة برجاء ملء النموذج التالي ببياناتك الصحيحة

تحميل الكتيب

دورات مشابهة
النفط والغاز
أبريل
، 2027
الإنجليزية
أبو ظبي
$3,600.00
النفط والغاز
أبريل
، 2027
الإنجليزية
الرياض
$3,600.00
النفط والغاز
مارس
، 2027
الإنجليزية
الكويت
$3,600.00
NEVADA | PROFESSIONAL EXPERIENCE

Program Professional Framework

Wireline Operations & Techniques (Slickline & E-Wireline)

Program Overview

Wireline is the most frequent form of well intervention, used for gauge runs, plug setting, valve change-outs, logging and perforating. This programme covers slickline, braided line and electric line operations: surface pressure control equipment, rig-up and pressure testing, toolstring design, jarring, running and pulling flow control devices, e-line logging and perforating, fishing and contingency planning. Safety and well control during live-well interventions receive particular attention, reflecting the operating practices of onshore and offshore operators in the region.

Learning Outcomes

  • ✓Specify and pressure test a wireline pressure control stack including lubricator, stuffing box or grease head and wireline valves.
  • ✓Design a slickline toolstring for a given task and calculate maximum safe pull based on wire size and weak point.
  • ✓Plan the running and pulling of plugs, gas lift valves and safety valves using appropriate running and pulling tools.
  • ✓Describe the purpose and rig-up of e-line logging, plug setting and perforating operations.
  • ✓Develop a fishing and contingency plan for stuck tools or wire breaks.

Target Audience

  • Wireline operators and supervisors
  • Well intervention and completion engineers
  • Production engineers planning well services
  • Well site supervisors and company representatives

Detailed Program Modules

01Wireline Services Overview
  • Slickline, braided line and electric line compared
  • Typical intervention tasks and job selection
  • Well completion components accessed by wireline
02Surface Equipment and Pressure Control
  • Wireline unit, measuring head and weight indicator
  • Lubricator, stuffing box, grease injection head and wireline valves
  • Rig-up, pressure testing and barrier requirements
03Slickline Toolstrings and Techniques
  • Rope sockets, stem, knuckle joints and jars
  • Gauge cutters, impression blocks and bailers
  • Wire selection, fatigue and pull limits
04Flow Control Devices
  • Nipple profiles, locks and plugs
  • Running and pulling tools
  • Gas lift valve and safety valve change-outs with kickover tools
05Electric Line Operations
  • Cased hole logging and production logging tools
  • Perforating safety and explosives handling
  • Setting bridge plugs and packers on e-line
06Fishing, Contingencies and Job Safety
  • Stuck tool and wire break scenarios
  • Fishing tools and recovery techniques
  • Job risk assessment, SIMOPS and handover

Training Methodology

Interactive expert-led sessions grounded in workplace examples
Case studies and practical exercises drawn from the region
Group workshops with peer review of decisions and deliverables
Formative feedback against clear performance criteria

Applied Project & Assessment

Applied Project

Participants prepare a complete job programme for a slickline intervention to replace a gas lift valve or set a plug: well data review, pressure control stack and test plan, toolstring diagrams, pull limit calculation, step-by-step procedure and a fishing contingency plan.

Assessment

Short diagnostic at the start, practical tasks linked to each learning outcome, and evaluation of the applied project against published criteria.